Malygin N.V., Chief Engineer, OJSC "ROSNEFT Oil Company”

From September 2003 till June 2005 Metallurgprokatmontazh LLC conducted construction works of the railway oil-loading complex at Privodino station, Kotlassky rayon, the Arkhangelsk region.

In this period Metallurgprokatmontazh LLC finished works of the preparatory period: grubbing and pit reclamation at the area of 18 ha, vertical planning of the territory with landfilling of 280 000 m3 volume, assembly of four tanks of 10 000 m3 volume for oil storing, assembly of technological pipelines, including furnishing with manufacturing equipment, with light towers and interception rods. Within the frame of the work complex there were built a cable routing pathway, distribution station, transformer substation and infrastructure objects: material warehouse, fire station, chemical analysis laboratory.

Results of joint work with Metallurgprokatmontazh LLC showed the cooperation effectiveness with this company. Works are conducted by qualified experts with higher education and great working experience. Metallurgprokatmontazh LLC applies advanced technology and modern materials.

The quality of construction and assembly works corresponds to adopted standards.

OJSC "Oil Company ROSNEFT-Arkhangelsknefteprodukt" recommends Metallurgprokatmontazh LLC as a reliable, competent partner who fulfills assumed obligations.