Current objects

Tank farms of OJSC “Severnye magistralnye nefteprovody”

Tank farms of OJSC “Severnye magistralnye nefteprovody” in Ukhta, Usinsk (the Komi Republic), pos. Privodino, the Arkhangelsk region

Metalware assembly, football stadium, Kazan.

Assembly of football stadium metalware for 45 000 spectators in Kazan

All Current objects

 

 

Finished objects

Construction of the pump station "Beregovaya" joining Russia and Turkey under the project “Blue flow”

Construction of the pump station "Beregovaya" joining Russia and Turkey under the project “Blue flow”. Participation in constrcution of gas pipeline joining Russia and Turkey under the project “Blue flow”. Assembly of three turbo generators of 5 mW capacity and construction of binding pipes of the pump unit complex in the pump station "Beregovaya". Pipe welding of carbon, low-alloyed, cold-resistant, stainless steels from 0,5 to 48 inches in diameter, and deflecting gas pipelines of 24 inches in diameter, 38,1 mm wall thickness, and designed for 25,1 mPa pressure.

Construction of the tank farm of 60 000 m3 volume of the Belomorsk oil plant in the Murmansk region for OJSC "NOVATEK”

Construction of the tank farm of 60 000 m3 volume of the Belomorsk oil plant in the Murmansk region for OJSC "NOVATEK”. Complex construction for realization of the Project for enlargement of the tank farm section of the Belomorsk oil plant, Beloe more, the Murmansk region. Transfer terminal V-60 000 m3.

From 30.11.04 till 30.06.2005 Metallurgprokatmontazh LLC conducted construction works on the project "Renovation of the tank farm section of Belomorsk oil plant": organization of the oil products transfer unit which includes the tank farm of 60000 m3 total volume.

Read more
Monakov D.Yu., Director of engineering and investment department, OJSC "NOVATEK"

Renovation of Arkhangelsk terminal of OJSC "Oil Company ROSNEFT-Arkhangelsknefteprodukt"

General maintenance of the two-sided railway pathway of light oil products at the terminal in p. Talagi.

OJSC "ROSNEFT-Arkhangelsknefteprodukt" expresses thanks to Metallurgprokatmontazh LLC for qualitative conducting of works within established deadlines at objects of Arkhangelsk terminal of OJSC "ROSNEFT-Arkhangelsknefteprodukt":

General maintenance of the railway pathway of light oil products;

Read more
Malygin N.V., Chief Engineer, OJSC "ROSNEFT-Arkhangelsknefteprodukt"

Renovation of the vertical steel tank of 20000 m³ volume at the oil transfer pumping station "Ukhta-1"

Disassembly of existing vertical steel tanks and the full complex of renovation works of vertical steel tank of 20000 m³ volume of OJSC “Severnye magistralnye nefteprovody”, TRANSNEFT JSC.

Renovation of the vertical steel tank of 20000 m³ volume at the oil transfer pumping station "Ukhta-1".

From April till October 2009 Metallurgprokatmontazh LLC conducted construction and assembly works at the object OJSC “Severnye magistralnye nefteprovody”: "Renovation of the vertical steel tank of 20000 m3 volume №5 oil transfer pumping station "Ukhta-1" and vertical steel tank of 5000 m3 №1 oil transfer pumping station "Ukhta". All works were finished within the deadlines established by the Customer. There were no observations concerning internal regulations, safety arrangements, protection of labor and breach of environmental safety.

Read more
Predein O.I., Acting General Director, OJSC “Severnye magistralnye nefteprovody”