Tank farm of 40 000 m3 volume at the railway oil-loading terminal in Kotlas, the Arkhangelsk region.

General contract for realization of Project of the railway oil-loading complex at Privodino station, Kotlassky rayon, the Arkhangelsk region. Implementation of complex of works:

preparation of building object at the area of 18 ha;

vertical planning with landfilling of 280 000 m3 volume;

erection of tank farm of 40 000 m3 volume with objects of production infrastructure.

From September 2003 till June 2005 Metallurgprokatmontazh LLC conducted construction works of the railway oil-loading complex at Privodino station, Kotlassky rayon, the Arkhangelsk region.

Read more
Malygin N.V., Chief Engineer, OJSC "ROSNEFT Oil Company”