Construction of the pump station "Beregovaya" joining Russia and Turkey under the project “Blue flow”

Construction of the pump station "Beregovaya" joining Russia and Turkey under the project “Blue flow”. Participation in constrcution of gas pipeline joining Russia and Turkey under the project “Blue flow”. Assembly of three turbo generators of 5 mW capacity and construction of binding pipes of the pump unit complex in the pump station "Beregovaya". Pipe welding of carbon, low-alloyed, cold-resistant, stainless steels from 0,5 to 48 inches in diameter, and deflecting gas pipelines of 24 inches in diameter, 38,1 mm wall thickness, and designed for 25,1 mPa pressure.